Example 16 — Location savings in subcontracted engineering services
Ch.IX · ¶9.130–9.131 · Company X · Company Y
OECD Guidelines 2022The parties
What happens
- Company X, an enterprise in Country X where wages for qualified engineers are high, provides highly specialised, high-quality engineering services to independent clients at a fixed hourly rate comparable to what competitors charge for similar services in the same market.
- A large part of Company X's engineering work is then subcontracted to Company Y, a new subsidiary in Country Y, which hires equally qualified engineers for substantially lower wages; significant location savings arise for the group.
- The clients still deal directly with Company X; they do not necessarily know about the subcontracting. For a while, Company X is able to keep its hourly rate at the original level.
- Competitive pressures then force Company X to lower its hourly rate to a level that would not cover the wages of qualified engineers in Country X but still yields a benefit when the engineers are in Country Y. Clients thereby receive part of the location savings.
Analysis
Demand for this type of engineering service is high. Company Y is the only company in a lower-cost location able to provide the services to the required quality standard, and its established technical know-how is a barrier to competition that lets it withstand competitive pricing pressures. Company X cannot engage qualified engineers in Country X for this work, because their wages would cost too much relative to the hourly rate charged to clients.
Who should be attributed the location savings that stay within the group?
Related: Section E of Part II (location savings) · Section D.6 of Chapter I (location savings and other local market features) · Example 8 (the clothing example of ¶9.128–9.129)