Cost plus method
Example 9 — Contract research for a group company
Chapter II · Cost plus method · ¶2.61 · Company A · Company B
OECD Guidelines 2022At a glance
Company A agrees to carry out contract research for Company B, a member of the same MNE group. Company B assumes all the risks related to the research and owns all the intangibles developed through it, and so also has the profit chances. How should Company A be remunerated?
The parties
Company A
Carries out the contract researchcontract research
Company B
Assumes all research risks · owns the intangibles developedWhat happens
- Company A and Company B both belong to the same MNE group.
- Under an agreement between the two, Company A is to carry out contract research for Company B.
- Every risk connected with the research is assumed by Company B.
- The intangibles developed through the research all belong to Company B, which therefore also has the profit chances the research brings.
Analysis
Company A performs the research. All the related risks lie with Company B, which also owns every intangible the research produces and therefore also has the profit chances that come from it.
How should Company A be remunerated for the research?
OECD analysis · Typical cost plus setup
The Guidelines regard an arrangement of this kind as typical of those to which a cost plus method is applied. The risks all lie with Company B, and because the intangibles developed are Company B's, so are the profit chances the research brings. Company A is to be compensated for all the costs of the research which the associated parties have agreed upon. The mark-up on top may reflect the degree of innovation and complexity of the research carried out.
Key takeaway
Contract research carried out for a group company that assumes all the risks and owns the resulting intangibles is a typical case for the cost plus method. The costs of the research are compensated, and the mark-up may reflect how innovative and complex the research is.
Related: Part II, Section D.2 (examples of the cost plus method) · ¶2.60 (contract manufacturing rewarded on a cost plus basis)